How We Make It

Drawing
to dispatch.

Scroll to watch a bolt being made — every step happens under our roof.

L 80 M16 S 24 QC PASSED 01

Our Process

Drawing → Dispatch

  1. 01Joint Discussion
  2. 02Drawing Approval
  3. 03Tool Room
  4. 04Manufacturing
  5. 05Heat Treatment
  6. 06Surface Finishing
  7. 07QC & Optical Sorting

Step by Step

Seven stages. One roof.

Every part follows the same controlled route — from your drawing to dispatch.

01

Joint Discussion

We study your application with your engineering team — no fitting issues or missing specs.

02

Drawing Approval

Complete drawings are approved before development starts.

03

Tool Room

Tooling is made in our fully equipped in-house tool room.

04

Manufacturing

Parts are made to the approved drawing in grades 4.6 to 14.9.

05

Heat Treatment

In-house heat treatment for the required strength.

06

Surface Finishing

Advanced surface finishing, proven for 1500+ hours in the salt spray test.

07

QC & Optical Sorting

Multi-level testing in our QC lab and optical sorting before dispatch.

Have a drawing?
Let's quote it.

Get a Quote →

Quality Lab

Tested before trusted.

Multi-level quality testing at every stage, in our own quality control laboratory.

Quality inspection of fasteners
  • 01

    Material verification

    Exhaustive testing and material verification in our QC laboratory.

  • 02

    Corrosion testing

    Surface finishes proven for 1500+ hours in the salt spray test.

  • 03

    Optical sorting

    Machines detect and remove dimensional or surface defects.

  • 04

    Defect-free dispatch

    100% defect-free supplies and a 98.79% on-time delivery record.

Start a project

Have a drawing? Let's build it.

Request a Quote